Solar Farm Pre Drilling For Piling.

                                          Solar Farm Pre - Drilling

We have completed Pre -Drilling programs on Solar farms to speed up the piling progress when ground conditions are hard or varied (soft with rock floaters).

Piles are driven easily into the pre drilled pilot hole saving considerable time for the pile driving crews and increasing accuracy where a pile driven in virgin ground may deviate, as a result large savings on the entire project.

                                         Solar Farm Pile Testing

In addition we offer a smaller tracked drill rig for Pre Drilling test holes for future solar farm locations, Conducting pile lateral and pull out tests for design.

The track mounted drill can travel over difficult terrain where no roads exist in the early stages of Solar farm site investigation.

We offer test pile extraction service using an excavator on completion.


Our recent project in Collinsville Queensland.